You are here
DC0095 - ACI 6.0 Multi-Cloud AWS Installation and Connectivity (Part 3)
Difficulty Level:
Lab Document:
<Please login to see the content>
Category:
Datacenter
The video covers installing ACI Multi-Cloud infrastructure in AWS, deploying a Cisco Cloud Network Controller (CNC), and provisioning the infra VPC using Catalyst 8000V (CCR) cloud routers. NDO is used to register the CNC and automate site-to-site connectivity configuration. Our focus for the lab is to bring up Inter-Site Network connectivity between on-prem DC and AWS cloud in preparation to support user tenant workload deployment.
Part 3 of this video covers cloud ISN provisioning
Topic:
- Cloud Network Controller Installation
- Cisco Cloud Router Installation
- ISN Provisioning
- Site-to-Site IPSec Connections
- MPBGP/EVPN Overlay
